Sunday, 30 June 2013

Taking a fence... again...

I've carried out some careful surgery to 'Shifting Sands' over the last couple of days, removing a length of concrete fencing, and replacing it... with a length of concrete fencing.

"Madness" I hear you cry, and you may well be right, but do let me explain.  Some time ago I build a small photographic diorama that was intended to be the virtual extension of the 'Fun Land' fence that forms part of the scenic break on 'Shifting Sands'.  I spent some time stencilling the letters 'FUN LAND' onto the fence to good effect.  With the possibility of re-using this fence on another project, but having to paint out the lettering, I opted to replace the fence on the layout with the lettered fence:


Having managed to remove the old fence andsplice in the new section, I carefully attempted to blend the colours.  There is a difference with the colour of the section that holds the sign, but that isn't really noticeable under normal conditions.  I've had to add backlighting to this shot as otherwise you cant' see too much through the hole in the sky!  The surplus fence sections, after a visit to the fence doctor, can now be re-used.

Some of you may have noticed that I re-edited my last posting here and may wonder why.  Well, I suppose I had been a bit hasty with a project and eventually realised that I had made a mistake and ended up reversing what I had done.  This is the photo that was removed:


Having swapped the generator wagon body onto a new chassis and built a replacement to larger dimensions, I realised that I had made a mistake and reversed the alterations, it simply didn't look right  The good news is that the new styrene body is now taking a life of it's own with a steel framed chassis scratchbuilt underneath, riding on a Peco N gauge chassis disguised with surplus Black Dog axleboxes:


Mind you, I still haven't decided what I need all these wagons for....

Colin

Sunday, 23 June 2013

Taking a fence, Pretenders, Mites and Burton

(aka "A General Catch-up")

Yet again time seems to have vanished into a black hole, so here's a quick summary of the pre and post Burton developments for 'Shifting Sands'.  Overall the day at the 7mm NGA's AGM went well, it was good to catch up with like-minded O9 modellers and fascinating to see the launch of the first ever plastic kit for O9 rolling stock, from Chivers Finelines.  I'll post something about that another day, I promise!

Firstly, something  visitors to Burton didn't see.... this short length of the new Peco spear fencing appeared on 'Shifting Sands' the weekend before the show, but never became permanent.  Quite simply, despite it being a detail I wanted to add, it just didn't look right.  I think that is due to two factors - firstly it is a little random, even if it is entirely in context, secondly, three panels would probably have looked better than two, in just the same way that an odd number of coaches in a train look better than even.  On a practical note it possibly wouldn't have survived long at the front edge of the board, despite some re-enforcement!

Don't take a fence...
At Burton the layout was graced by a visit from two locomotives belonging to Jordan 'Rough Shunter' Leeds, based on Ravenglass and Eskdale prototypes.  Both were built on commission by Paul Windle and painted by Ken Gibbons.  Sadly the usual 15" gauge story of coupler incompatibility made it impossible to use them in service, and 'River Mite' took objection to 9" curves.

Ratty 'Pretender' visits 'Shifting Sands' (and looks at home)
'River Mite' poses for photographs
The opportunity was taken to line the two locos up with my own Ravenglass style loco 'Cumbia'

Ratty motive power line-up
The view above reveals some of the pre-Burton work on the layout in the shed area, the eagle eyed will see that the caravan has moved back slightly, allowing the installation of a small coaling stage and a revised mix of details.

I had promised myself no further wagon tinkering before Burton, and true to my word I waited.... I did make a couple of purchases from Steve Bennett at Black Dog Mining at the show and these have allowed a couple more wagons to be created to join those assembled after Narrow Gauge North.  It's best not to ask too many questions about how many times some of my Black Dog chassis have swapped bodies and dare I say it I have had my eyes on the Black Dog chassis under some of the 'Shifting Sands' fleet... but that moment has passed (largely after remembering Steve Bennett's compliments about the generator wagon just visible in the picture of 'River Mite') and common sense now reins .  Well, most of the time anyway....

Colin
[Edited 29/06/2013]

Saturday, 1 June 2013

Countdown to Burton

Blimey, it's June 1st.  That means it's only a week until 'Shifting Sands' makes it's trip to the AGM and Convention of the 7mm Narrow Gauge Association in Burton upon Trent.  We have of course done this before, as shown in Mick Thornton's photo from 2007.



Locomotives and stock are being checked over and tested, for most of them it is a good 18 months since they were last used, and I've been able to make a few planned changes to scenic details, so please do come along and play 'spot the difference'!  There's still a little to do but hopefully things are on schedule to get the layout boxed up Friday night for the trip south.

In order to soak up some inspiration an afternoon at the Sherwood Forest Railway was in order, where a warm welcome, and equally warm sunshine, were available to allow some photography and several train rides.  I do sometimes miss the immediacy of my old Fotopic websites to record days like these, photo-only content doesn't always work with blogs and Facebook uploads seem to get lost in the ether of time.  Sites such as Photobucket or Flickr don't allow the level of control over the page appearance as Fotopic did....


Colin

Tuesday, 21 May 2013

Little Things...

Not a lot to report from the O9 Modeller workbench of late, in fact progress has remained set at a speed below slow... I have managed to paint a batch or two of smaller scenic items, some of which have an immediate use and others may have to wait for the end of the next ice age.

Some extra parts have been added to the Scooter's back-box on the advice of a former RH&DR employee (note also that the couplers are in place and light weathering applied):


The rest are currently stored in a Chinese take-away container for future use, there are a mixture of Skytrex, Knightwing, Black Dog and other parts:


Some of these are destined to add some fresh details to 'Shifting Sands' in advance of it's appearance at the 7mm Narrow Gauge Association AGM and Convention in Burton-upon-Trent on 8th June, though my plans for certain additions to the layout look set to fall by the wayside as my supply of 'round tuits' has vanished, I suspect they may have gone to the tip when I last tidied up the shed.

Others are for future projects, notably the tote bags of aggregate, the hardcore* 'Shifting Sands' followers will know that there are two of these on the layout already and we're not about to go into competition with Wickes.  As to what these future projects are depends a lot on time, energy, motivation and imagination (all in short supply), all those jobs that need doing around the house (which are abundant) and the lure of other distractions, some actually miniature railway related!  Time will tell, though if anyone can loan me a TARDIS I'd be grateful....

Colin

* Sorry, no pun intended. Honest...

Sunday, 28 April 2013

Building the Romney Scooter - 2


Someone seems to have stolen the last two months, honestly.... alternatively, if anyone could explain to me where they have gone I'd be grateful....

The workshop eventually warmed up to allow primer application and subsequently a coat Halfords aerosol yellow over the warning panels (with suitably improvised masking) in order to give a gloss base to later apply the Fox wasp stripe transfers to.  I opted for 1970's style green, which was brush applied (a blend of Citadel 'Snot green'* and Vallejo 'Black green').  All other colours were also brush applied and were all acrylics except the red, which was a Revell enamel.  Varnish is Railmatch matt from an aerosol.


Once painting was complete and left to dry for a few days, I added glazing - 10 thou clear styrene held in place and coated with 'Kleer' floor polish, added Araldite to the headlights to make them look like light lenses, and also fitted the exhaust, load and roof in place, added weight in the cab and bonnet and fitted the Kato chassis in place with 'tacky wax'.



Since these pictures were taken I have added MicroTrains couplings and lightly weathered the model to a 'day to day' condition.  More pictures soon, hopefully with a more interesting background....


Colin

*which prompts the statement "oh yes it is!"

I'll get my coat....

Sunday, 7 April 2013

Re-roofing the 'Romneys' - Completion

Just a quick update, some warmer weather a few weekends ago allowed access to the workshop at at reasonable temperature so the new 'Romney' roofs were primed, painted and varnished.  Following this they were fixed into position on the coaches and lightly weathered.


I'm very impressed with how these roofs have turned out, given that in the past I have not been confident to use the Dapol/Hornby surface as it came due to the problem of hiding the joins.  However, I've managed to loose them well on these (I put this down to employing a little more patience in rubbing down and re-filling), so these may form the prototype for future roofing work.

Colin

Monday, 11 March 2013

A pleasant diversion on the way to somewhere?

As those who have observed my construction of the Unit Models wagon kit may have mused, I seem to be on the cusp of one of my industrial/agricultural minimum gauge phases.  Those who know me well will know that these periods don't often last that long, this time might be different, we'll have to see!

At Narrow Gauge North a conversation with Steve Bennett of Black Dog Mining about what O9 bits he had to hand resulted in the purchase of two wagon bodies that by close of play that same day had been attached to two chassis from my stockpile and were ready for painting:


The biggest/longest part of the build was cutting out the mountings for MicroTrains couplers....

A few weeks ago I had started an experiment in building O9 wagon bodies from Basswood, a technique I had wanted to play with for a while.  I hadn't got that far really, but a spare floor that I had marked out to fit a 5ft Black Dog Mining Chassis has been put into use to rebody my chequerplate flat wagon (itself a throw-together of surplus bits).  All the staining/painting/weathering work on this was completed in an afternoon:


Who knows where it will all lead?!

Colin