Sunday, 26 April 2026

Three Point Doodles

I've found myself doodling again... several times... I'll spare you all dumping all the designs in one post, so here are the first two, based on the 'Tragbar/Chetley' plan. I realised that I may not have really done this justice in my original mock-ups, and looking carefully the rearmost, L/H point was aligned wrongly. 

The first plan on the revised template is designed to be simpler scenically than the Inglenook plans, although it shares some common elements. There are less buildings and any provision for concealed, rear operation, point controls is dealt with by a low rock face. A grounded 18" gauge wagon body (which I've possibly drawn a little too small) from 422 Modelmaking components sits behind a sleeper-edged platform. This arrangement will allow operation of a passenger train formed of couple of 4w coaches and for another locomotive to release the incoming locomotive.


In many ways I'd like to build something that stock and motive power from 'Shifting Sands' can operate on. In this sort of space the obvious idea is to model the "other" shed of the railway (the one at Shifting Sands itself cannot possibly house everything!). This plan turns things on their head, but only very slightly... The scenic area is shortened to allow a small fiddle area on the board itself, so it is truly self-contained. New style Peco loco lifts would be deployed to lift locos on and off the layout to take their turn at the sheds.



We shall return to this theme very soon...

Colin


No comments:

Post a Comment