Showing posts with label Railway Cupboard. Show all posts
Showing posts with label Railway Cupboard. Show all posts

Sunday, 10 July 2022

Slidin' down to the Workbench

Picking up from where the last post left off, the shelf riser is now varnished and in place above the workbench. A slide-in box has also been created that sits within. It lifts out to sit on the desk whenever modelling is envisaged. This is constructed with a 5mm ply base and 3mm sides, which use the same recycled material as the top and bottom of the riser.


The slide-n box performs two useful functions, firstly holding the 'Really Useful Box' that holds my smaller "essential" tools, and on the other side of the divide provides a space for "work in progress" projects to be stored between sessions. In the past I had simply left both the tool box and anything in build on the work board whilst it was put away, so the new box is essentially part one of its replacement. Part two is a 3mm MDF board to act as a desk protector, this was coated both sides with  a couple of coats of emulsion and has a trim strip along the front edge to prevent it being pushed backwards.
 

All far to clean so I have now actually done some modelling on it before giving in to the heat. However, before I go into any detail there is the matter of investigating this recently unearthed archive photo which appears to show the presence of hitherto unknown abandoned rails buried in the yard by the 'Old Quarry Line' workshop...


Colin



Saturday, 18 June 2022

Boxing Clever

There's still very little action at the O9 Modeller workbench, however I have made a major change in the way the bench itself is set up, dropping it 6 inches in height from worktop height to a more conventional desk height. This does undo some of the original premise but needs must for ongoing comfort.

As part of these changes storage is being revised, and I have built this seemingly unassuming box.


The sides and back are some 9mm ply a friend kindly supplied in lockdown, whilst the top and bottom are some 3mm ply recovered from furniture that was otherwise headed for the skip last year. Lots of clamping and waiting for glue to dry has resulted in a reasonably square box... The strengthening strip of material across the top of the opening is left over from strengthening 'Shifting Sands' back in 2019. The box is now being varnished ready for use.

Its purpose directly relates to moving the desk downwards, those 6 inches gave access to vital storage space under and behind the desk. I've had to rejig several things to make up for this, such as moving a few things out to the workshop. My year-old work tray has been abandoned for now as it has nowhere to store as it too sat in the 6 inch gap on top of some stacked crates. I had balanced out these consequences with my desire to change things.


The photo above neatly shows how with the desk lower the top of the "work from home" monitor is clear of one of the shelves, where before it had obscured it. In the middle of the shelf there is a distinct air gap above my box of adhesives and I don't need all that space to get things out of the box, so the new construction will act as a 'riser' to push the box upwards and use the space underneath to slide things in and out. 

Looking at other things as a result of these moves, there may be a few disposals to ease space a little and having moved a few things around I've decided that 'The Headshunt' diorama should get a scenic makeover and a protective box along the lines of that I made for the Christmas Pizza - there is plenty more ply and hardboard available!

Colin

Thursday, 20 October 2016

Rambling Thoughts of a Desk-Sitter

I've spent some time over the last week or so looking at some of the half completed odds and sods about the place and trying to create some sort of order from them. Having disposed of at least one offending item my thoughts drifted towards the possibility of a 'desk-sitter' shunting plank approx 25 x 6"...


Of course we have been here before, most recently with 'Upcycle', which was a little longer at 29" long, which was one of the issues that actually made it difficult to use as it was too tight a fit on the desk (i.e. too much needed clearing out of the way!)


If a new project does come into being, the lessons of Upcycle will be taken on board, notably having a decent height of backscene and not having a kick-back siding making life difficult. One option is to take the "less is more" single point approach that worked well on another desk-sitting project, my Gn15 'Ambassador Works', seen here in full form... on a desk...


Whilst delving through photos of past projects, it is worth pointing out that the balsa framed, foamcore topped baseboard being considered for this project is the much altered remains of the 'Misterton Fen Tramway' board from a few years ago. Subsequently used as a test track it was ironically replaced by 'Upcycle' and it's descendants. I have recently extended it at the right-hand end and for this project the left-hand end would also be extended.


We shall see...

Colin

Friday, 1 January 2016

Twenty16

A "Happy New Year" from O9 Modeller...

A new year and one destined to be full of change. Life is set to change again in a way that will put even more pressure on time and space in the Peake family 'cottage' for the foreseeable future. I think that this time it may be the catalyst for major changes in the way hobby time is conducted (if indeed much remains in the future) and the nature of what is produced. I've hinted at this previously with my 'nagging doubts' about the railway cupboard workbench (see 'Ten') but it seems to be the time to seriously consider the options, not least as I feel that the square footage occupied by the bench and legroom underneath may be required domestically. 

So where could the workbench wander? Whilst the dark, wet evenings of the past week are enough to put anyone off wanting to move lock, stock and barrel to the workshop, it is an option, despite being uninsulated and rather anti-social! To be honest, I have grabbed a few moments in there of late for an ongoing diorama project, as seen here (more another time):


Also under consideration is some sort of portable workbench, maybe a  return of the “kitchen table workshop”. I'm working through the potential issues so hopefully something will be feasible. As for what is produced, we shall see, the more eagle eyed will have spotted some excessive wagon tinkering again, including a potential diversion to O-16.5.... 

Colin

Sunday, 11 October 2015

Ten

Reflecting on 'Shifting Sands' appearance at the Sheffield Model Railway Society’s annual exhibition yesterday I realised that it is ten years since the layout made it's début at the Retford show in November 2005. Whilst not the most prolific of exhibition layouts previous appearances have been notched up twice each at Retford, Burton-on-Trent (for the 7mm Narrow Gauge Association) and the Cleethorpes Coast Light Railway; once each at 7mm NGA and 009 Society members’ days; plus an 18-month residence at the ‘Rails to the Sands’ display, also in Cleethorpes.


Going back to over ten years ago, modelling in O9 was only ever supposed to be a brief distraction from (what were then) my 4mm scale activities, so a small layout requiring some coaches and 3/4 locos was envisaged. From there of course, it snowballed into 'Shifting Sands' and then to modelling actual 15" gauge equipment (the original designs were all freelance). Inevitably 4mm scale went to the sidelines and although there have been some distractions along the way, most of my modelling in the last decade or so years has been in O9.

Part of me wonders if it is perhaps time for a change? But a change to what? What will time, space and resources allow… 

Thoughts in this direction were further prompted by the 'Talking Point' article in the October Railway Modeller, an interesting account of that most mundane but essential modelling standard, the workbench.


Every modeller has a different view of what environment they prefer to work in, from the kitchen table to the fully-equipped workshop. As readers of this blog will know, personally I’m closer in reality to the former in my walk-in cupboard 'Tardis' (because there is more in there than could possibly fit!). However, there have been some nagging doubts for a while now that the railway cupboard workbench isn't always getting me the best results or at times the most comfortable environment to work in. I have wondered about alternatives, but so far I've taken no action.

Perhaps the answer is a change of ethos, to do things differently to suit the environment? 

Allons-y, as the Tenth Doctor might say....















Colin


Wednesday, 18 February 2015

Steps on the Path? (Up-cycle pt.5)

As hinted previously, things have been rather quiet on the ‘Up-cycle’ front lately due to an emerging view that the work so far is a step on the path rather than the destination itself. I'm not sure what has provoked this change in thought, but I suspect it is fuelled by a feeling that ‘Up-cycle’ was really just that little bit too small to be a layout itself and perhaps too big to be a diorama.

Although ‘Up-cycle’ was built with (and fulfils) the dual purpose of fitting onto my already cramped desktop and storing in an impossibly small slot, in practice there is a rather cumbersome movement between the two. Since the re-purposing of the scheme as a dual identity test track/diorama scene I've actually started to wonder if I have made a compromise too far and whether the best outcome is in fact to split these two purposes apart and make some further steps:


  • A simple (dual gauge) test track which sits on the desk in a location more suited to use whilst other work is ongoing.  Now complete:

  • A diorama suitable for photography could be created using the existing scenic concept and material and store in the location used for ‘Up-cycle’. In progress:

  • Adopt the view that the existing board stands as a proof-of-concept for the method of construction used. The diorama board above uses more shelving offcuts and plywood:

The only real loss here will be the length of the track available for ‘play’ purposes but I get the feeling that in the genuine spirit of the project, the potentially redundant board could easily be “upcycled” itself. Although built to fit in a limited vertical space there is every possibility that it could be extended upwards with higher backscene boards and indeed outwards if required to add depth. Alternatively, it could make a useful fiddle yard run-off for a larger project…

Colin

Saturday, 20 December 2014

Introducing 'Up-cycle' - A MicrO-9 Project

As some of you will know, I'm very short on space about the house these days and my workbench lives in a walk-in bedroom cupboard, aka the 'Railway Cupboard', aka the 'Tardis'.  Over the years various schemes have been sketched up to get a working bit of railway in there but most were just too daft to actually build, or would compromise space somewhat.  Last month I pictured the workbench in a rare, tidy moment...

This month it's a bit different:


I've always come back to idea that the best way of getting a working "layout" in there is simply a desk-sitter shunting plank.  So the size is rather pre-determined.  Finding space to store it whilst not in use is the other main design criteria. 

During a week off work in early December I managed to create a workable baseboard based on the principles of a box file layout (which was an alternative at one point) - i.e. three low sides and a base, but dispensing with any folding bits and incorporating some timber under the base for strength and to give the wiring somewhere to run. What you see above is all 29 1/2" x 6" of it, underneath it looks like this, you can see that with some foresight I drilled two 16mm holes in the ply roughly where the slide switches for the points would be:


Almost everything is recycled from somewhere or second-hand, hence the project name 'Up-cycled' (and we know what happened to my last project name..).  The ply was part of some boxing-in we removed from the living room during redecoration and the timber (allegedly pine but I'm not convinced) from a shelving unit I built as a shoe rack during that week off. The strip along the front is some 'J' section timber, marked up as costing me 20p at some point in the past. Everything was glued and screwed/pinned together and the result is a lightweight, strong board. All ply and timber parts are varnished to help avoid warping.

On top of the ply is a layer of 5mm foamcore and then cork tiles, this composite accepts and holds track pins with nothing poking out underneath.  Trackwork is all Peco, the points were secondhand some time ago and the track is mostly some short lengths I picked up for 50p at a recent exhibition, although some short rail lengths were swapped for longer lengths from the spares box to avoid too many joins.  Points are operated and frog polarity changed using slide switches recovered from an earlier project:


The overall height of the sides of the board is 70mm.  This is very low to be a backscene but can be disguised with walls and fences. This is where the second part of my design criteria came into play - any micro layout had to store in a very shallow space above a set of drawers:


All wiring is now complete and test running has commenced using my MG Models tram loco and A1 Models diesel. I hope that eventually I will be able to do a little shunting of sorts and certainly for testing MicroTrains coupling set-ups. This low level shot shows that there is enough depth to also allow use as a photographic backdrop:


More as and when the project develops.

Colin

Sunday, 16 November 2014

Infamy and Inactivity

Examination of the latest (December 2014) issue of the 'Railway Modeller' has me, and 'Shifting Sands' implicated as an influence on Peter Leadley's O9 'Clee Valley Railway'....


Do have a read about Peter's exploits in a version of O9 that is very much in my own, miniature railway, way of thinking rather than industrial.  It is no secret that his Paul Windle-built locos were a driving factor behind the creation of my own 'King George VI' locomotive.

This isn't the first time I've been implicated in the 'Modeller this year, I seen to recall getting a mention in the articles on 'Roundtree Sidings' earlier in the year, and a picture of one of my 4mm scale wagons recently appeared in 'Traction', sans credit <<grrr>>

You may have noticed that it is three months since the last update of this blog - I've been rather tied up with domestic activities of late, however the workbench is now clear of other-roomly content, a few bits of storage moved about and is ready for take off, although with precisely what remains to be seen - watch this space.


I can't let a title such as Infamy and Inactivity go without this....


Colin

Saturday, 24 December 2011

Merry Christmas (DIY is Over)

Well here we are, Christmas Eve.  The last major house renovation job of the current projects is complete, the hall, stairs and landing are now fully painted and carpeted with only a few minor finishing touches to add.  A huge sigh of relief was heard when the carpet fitters left yesterday afternoon!  With no major DIY tasks planned for the next few months, I could finally undertake the job that bridged the gap between DIY and model making, creating my new cupboard based workbench.

And here it is:


The eagle-eyed will see that it is a little higher than the artists impression from August, as it became obvious through experimentation that a stool was easier to manage in the space than a chair.  This doesn't worry me, it also creates a good height to stand at for quick tasks.

The basis of the new workbench is a piece of timber furniture board from Wickes, which goes against my recycle-where-possible ethos, but seemed a better option than a piece of contiboard or MDF.  It is certainly solid, more so as it is braced underneath with sections of 20 x 15mm timber, sourced from the 'railway department' stash and bearing 30p price tags from the local hardware store's bargain bin!  The same stash provided 9mm quad bead to go around the edges to catch rogue wheels etc from rolling away.  This is very much a work in progress and is currently being varnished to complete the job.

Finally, from the archives, a 2007 view of the Somerthorpe Miniature Railway...

Monday, 8 August 2011

Secrets of the Railway Cupboard Part 2 - The Big Secret!

Two months ago I let readers of the blog into my railway cupboard, which quite frankly, despite all my hard work painting it, looked more than a little untidy once refilled.  However, two months ago now seems like a very long time ago... Life has changed.

A fortnight ago my wife announced that there will be a new arrival in the Peake household in the first quarter of 2012 (and no, not from Hornby).  Yes, we are expecting a baby!  Due to this there has to be a major re-organisation of our "living quarters" and the original, mark 1 plans for a railway room/study have been dusted off, typex applied and 'Nursery' added instead.  Of course this has a major impact on my intended scheme for an alcove based desk and possible test track above.  Indeed, the alcove itself will be no more as the chimney breast will have give way to make more space in the bedroom.

And it will be a bedroom only, no space really for model trains.  Or will there...?


Plans are afoot to re-organise the Railway Cupboard to provide some additional shelving (white) and a built-in but lift-out workbench (yellow).  Granted, there will have to be some ruthless clearing out of the "someday and maybe" projects, and all those things on the shelves that shouldn't be will have to go elsewhere, but there is a chance it could work.  Things have to change whatever happens, time and pennies will be in short supply in the months/years to come so a carefully planned approach is required.  I'm still working on that...

Wednesday, 1 June 2011

Secrets of the Railway Cupboard

So, as revealed in Sunday's post, the planned railway room was knocked on the head by a combination of cost and common sense.  I'll admit there followed some dark days full of contemplation, soul searching, potential sales lists and listening to to The Smiths... (OK, some of that might not be true, I certainly didn't manage to find the Smiths CD).  Perhaps I really felt that something had to change or give in modelling terms in order to carry on?

Whilst I'm still working on how to provide more space for layout building in the future, I at least have allocated work space (and a grand plan to use it) and I still have my storage facility.  Enter the railway cupboard (though not literally as you are likely to stub your toe!).  Our house is blessed with two walk-in wardrobes/closets and the one in the main bedroom has been the railway cupboard for many years.  Over that time random shelves have been added and I'd got it pretty much to suit my needs.  However, most of the paint and some of the plaster were falling off the wall and the gloss woodwork was going a sour cream shade.  So bad in fact, that I didn't take a 'before' picture to go with this 'after' one:

Refurbished Railway Cupboard.
As a summary of work completed, I removed a false ceiling at door frame height and all but one shelf; the middle rear shelf is original, those above and below are copies in the original architrave support/floorboard plank style; side shelves are pine on recycled brackets; the ceiling was papered (over the cracks!) and painted; the walls have been patch plastered, filled, base-coated and emulsioned; skirting and shelves primed and painted in water based satin (for speed) and the door frame primed and glossed. To finish off the floor has been covered with hardboard followed by self-adhesive vinyl planks.  Despite an injection of capital from the 'modelling fund' to buy some timber and the flooring, I've made as much use of left overs and recycled material and left over paint as I can to keep costs down.  Almost looks to good to put anything in there!

But I did....

Rather full!
To be honest there is more in there than usual, the contents of two stacking crates and everything to the left hand side on the floor is usually on or under the workbench, and will hopefully be out there again soon.  In usual form 'Shifting Sands' would sit on the left in it's storage box, taking up about 28" x 11".  I have made careful provision for storage of larger items in the refurbished cupboard, the lower shelf is over 4' from the floor, allowing me to store timber and perhaps one day a 4' long baseboard end-on.  Unfortunately there's a long way to go before we get to that stage, and there still might not be enough floor space to make it work.

So one thing that did occur to me was whether 'Shifting Samds' could be rebuilt in a format that took up less storage floorspace?  This would actually be a return to the very early days of the design when the idea was that almost everything over fence/figure height would be removable for storage and the board stored in under 6" depth.  I produced another of my composite doodles to see how it might look with a few of the bulkier buildings removed:

A less visually bulky, reduced height 'Shifting Sands'
The ice cream van makes another appearance (I do actually have the model in store), along with a camper van, also from Oxford Diecast.  The removeable backscene would be reduced in height to the line just visible sketched behind the vehicles.  A new, lighter weight, storage box would be made to complete the transformation.  Something does appeal to me about the simplicity of this arrangement, but echoing back to my previous posting, would it again be tinkering and diluting a proven concept?